Massie Thomasset Connector Project 2021

11 February 2021

The City will be improving the connectivity of the Downtown Core and provide additional free parking lots to continue to support our economic development.

The Massie Thomassset Connector Project will include the following:

  • Connection of Massie Drive to Thomasset Place
  • Installation of a continual sidewalk on the south side of the new connector from Veterans Memorial Parkway to Claude Road
  • Construction of three new parking lots
  • Completion of a paved pathway from Massie Drive south to the Westbrook Mall area on Goldstream Avenue
  • Completion of a gravel path from the new connector through Danbrook Park to the Danbrook Road parking lot

Work is anticipated to occur in June and July of this summer.  All residents in the area have been notified.